![]() |
Please Visit our Site Sponsors
|
![]() |
|
![]() |
![]() |
|
|
| General 6.7 Discussion General 6.7 Discussion |
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
|||
|
ordeed 450 KR
My buddy ordered a 2011 F450 king Ranch bedliner, nav, 5th wheel prep fully loaded. The dealer ordered it and got a March 1st build date. They sent a notice March 1st and said would be built March 22. It was built March 22 and shipped to a warehouse. It is in "holding" with no release date. What is going on? Anyone know? He had an 08 450 kr fully loaded and sold it 2 months ago. We haul farm equipment a lot that is why he such a beast. I hope they are holding them for a couple weeks to update to the 400 775 program. HEHE.
P.S. The dealer also has 2 F250's and 2 F-350's in the same warehouse in Kentucky I guess is where it is. We are in NC. I just assume they are in KY near the factory. |
| Sponsored Links | ||
Advertisement | ||
|
|||
|
I know the feeling as my F350 was built on 3/22 and has yet to be loaded for shipping.. Im without a truck too... Here they sit @ KTP.
![]() ![]()
|
|
|||
|
man if i worked at one of those plants id have such a hard time not grabbin keys and goign and seeing how they actually ran.
|
|
|||
|
anyone in michigan looking to order a truck contact me I work for Suburban Ford in waterford michigan
|
| Sponsored Links | |
Advertisement | |
![]() |
| Thread Tools | |
| Display Modes | |
|
|