![]() |
Please Visit our Site Sponsors
|
![]() |
|
![]() |
![]() |
|
|
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
|||
|
Cab on 6.4 motor swap 22hrs total
Just finishing up a 6.4 motor swap. I didn't have the cash to pay someone so I had to do it myself. I bought a longblock and start to finish including swaping over motor parts it took me 20-22 hrs. here are some pics. I disconnected the cab and jacked it up about 6"
heres a link to a some instructions I didn't have to pull the turbos like the state here http://www.aev.com/uploads/file/BodyOn64EngineMtnc.pdf |
| Sponsored Links | ||
Advertisement | ||
|
|||
|
what made you have to pull it?
|
| Sponsored Links | |
Advertisement | |
![]() |
| Thread Tools | |
| Display Modes | |
|
|