![]() |
Please Visit our Site Sponsors
|
![]() |
|
![]() |
![]() |
|
|
| 6.0L Exterior Discussion Body and Accessories Talk |
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
|||
|
Little friday night project
Made something "cool" yesterday night, takes about 3-4 hours, with a friend of mine and sure our friend molson dry ahah the job should had take way less time but
![]() I got some stuff at the truck part shop this week, 1 clamp, 2 u bolts and a 90* elbow for 90$ expensive but i needed them NOW so.. I already had the 4" pipe standing from old 7.3 exhaust i made. Tell me what you think, my first stack job ( low buck ). Sorry for the crappy pic, too lazy to get out in the morning to take a pic ah |
| Sponsored Links | |
Advertisement | |
![]() |
| Thread Tools | |
| Display Modes | |
|
|